Service Interrupted: 21st January 2010 14:53 > 15:28

At 14:53 a thread locked on our main front-end node, this rendered all servers behind it inaccessible.

After the system was deemed non-responsive, the system was immediately power cycled (restarted) – upon bringing the system back on line, as a matter of course, we felt it necessary to perform a file system check to verify the integrity of the disk due to the forced shut down.

Thanks to our quick response and pro-active monitoring we managed to keep the unscheduled downtime to a maximum of 35 minutes, we apologise for any inconvenience this has caused.

As always – we recommend following sonassihosting for the latest network information.

This entry was posted in Server Maintenance. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong> <pre lang="" line="" escaped="">